TSE:ENT $

Whether transporting in a single piece, or lifting and positioning for install, ENTREC’s vast experience in the manipulation of cryogenic vessels for Liquefied Natural Gas or LNG production has helped to establish our company as a leader within the space.

The advantage of being an integrated crane service provider allows us to contribute through all phases, from the sourcing, to the transport of oversized loads, to the lifting and install on final site of some of the most cumbersome pieces of equipment in the field.

Case Studies

DOUBLE-BUNK LOAD

In August of 2014, ENTREC was tasked with transporting an extremly large “Flash Stripper” vessel from Edmonton, AB to Fort […]

Read More